Categories

 

May 27
Bridge on Barbara Drive in Richland County to be Repaired

The South Carolina Department of Transportation (SCDOT) plans to repair the bridge on Barbara Drive over Little Jackson Creek in Richland County.

 

            Repair of the bridge is to include placement of piles.  The bridge will be closed on June 2 for approximately 4 weeks.  Pending any delays due to weather conditions or other factors, the bridge should be reopened to traffic by July 4.

 

            Due to the relatively low traffic volumes, and to minimize the construction duration, cost, and impact to property owners in the area, the road will be closed and traffic detoured during construction.  The current plan is for the detour to use roads S-1722 (Edgewater Drive), S-1296 (Legrand Road), S-1296 (Grampian Hill Road, US 1 (Two Notch Road), and S-2213 (Dalton Road).